Blue Rail Lighthouse Pavilion
Manitowoc, Wisconsin

IMG_7028

Project Overview

Client: City of Manitowoc
Scope:
2,500 sq. ft. New Construction
Project Delivery: Hard Bid
Location: Manitowoc, WI

Blue Rail Lighthouse Pavilion 

POD Winner Seal-Silver ColorThis seasonal community park facility was a new 2,500 square foot ground-up build. The building includes men's and women's restroom facilities, a public drinking fountain, a pet drinking fountain, an open air shelter space, and a beach shower to accommodate users of the Mariners Trail and the Manitowoc Marina south pier and breakwater.

The facility was designed to be a visually ornate addition to the Manitowoc Lakeshore and serve as a functional park shelter.

The construction started in September 2020, when COVID-19 related material shortages and delays were common. A.C.E. overcame these shortages by working with the City of Manitowoc to offer material alternates and slight design changes to keep the project moving. The project is located a few hundred feet from the shoreline of Lake Michigan and given the time of year, the weather also played a major role in the project schedule. Possibly the biggest challenge was the client's decision to change the structure's design from unheated to heated after construction began. To resolve this, we modified the roof structure to meet code requirements without changing the exterior appearance of the building.

The early twentieth-century design of the structure called for construction methods not typically used with modern-day projects. Examples of this include hand framed rafters, dormers, and arches. The historic boathouse design of this facility required A.C.E. Building Service to utilize a wide array of unique features that are not typical of an A.C.E. building. In addition, the building's design showcased a wall of glass panels to illuminate the interior space, which houses a breezeway equipped with benches and a water fountain. Our client commissioned local artists to paint themed murals inside of the space, which compliments the natural backdrop of Lake Michigan. The stone material for the exterior of the building was sourced locally from a quarry in northern Wisconsin.

A.C.E. made the Lighthouse Pavilion come to life by demonstrating their skills as true craftsmen, resulting in a stunningly simplistic, yet highly detailed building well-regarded by citizens and visitors alike.

Justin M. Nickels
Mayor, City of Manitowoc

 